Relaibility Action Plan - Critical Equipemtns of Three Phase Electric Locomotives (New)

Balance 3-Phase electric locomotives to be completed

                  Select for Shed wise details
Sno.WorkDescriptionAQKYNHWHGMOWATGZBLDHCNBRPMLGDTATABIABRCTKDTotal
1 EXISTING RAPUse of 8 Amps rating reed relay (Ref : RDSO letter no. EL/11.5.5/5 dtd. 28.12.12)2300413000001900086
2 EXISTING RAPAvoiding low pressure zone above hood ventilator. (Ref : MS/0434)81018000000008035
3 EXISTING RAPdB level of output of fibre optic transmitters. (Ref : SMI/257)00000820000000082
4 EXISTING RAPProvision of cab redundancy in WAG9/9H and WAP7 (Ref : MS/0429and MS/0435)141390103821001264540059483
5 EXISTING RAPModified cooling radiators for SR. (Ref : RDSO L/N EL/11.5.5/5 dt. 15.02.10.)32000080000300043
6 EXISTING RAPShifting of MCB-100 to HB-2 panel. (Ref : MS/0367)00002000000130015
7 EXISTING RAPRehabilitation of PCB cards (Ref : RDSO guideline no. ELG/2008/01, Rev. ‘1’ dated 13.08.09)4700316132004074876026404
8 EXISTING RAPReplacement of EPROM in locomotives after 6 years (Ref : TOT /RDSO guideline)40003104500406485600311
9 CLEANING AND PRESSURIZATION OF MACHINE ROOMAvailability of Industrial type vacuum cleaner (Ref : All the sheds holding 3-Phase locomotives and CLW to have industrial type vacuum cleaner.)00000417000000021
10 CLEANING AND PRESSURIZATION OF MACHINE ROOMGasket of OCB (Ref : RDSO guideline circulated vide letter no. EL/3.1.35/10 dated 11.04.16.)00000019005000024
11 CLEANING AND PRESSURIZATION OF MACHINE ROOMRemoval of dust (Ref : RDSO guideline circulated vide letter no. EL/3.1.35/10 dated 11.04.16.)0000001900830000102
12 CLEANING AND PRESSURIZATION OF MACHINE ROOMPlugging of leak holes (Ref : RDSO guideline circulated vide letter no. EL/3.1.35/10 dated 11.04.16.)0000040000063000103
13 CLEANING AND PRESSURIZATION OF MACHINE ROOMFilter cleaning (Ref : SMI/286)000000000000000
14 CLEANING AND PRESSURIZATION OF MACHINE ROOMRadiator cleaning (Ref : SMI/287)00000018000000018
15 CLEANING AND PRESSURIZATION OF MACHINE ROOMTo ensure specified air delivery (Ref : SMI/255 for Measurement of air delivery at specified location)00000014000000014
16 OTHER MEASURESAuxiliary converter knife contacts (Ref : Application of grease CG71 or similar on the knife contacts of auxiliary converters in IC and every major schedule to increase the conductivity between male-female contacts.)0000020000000362379
17 OTHER MEASURESKUC 153 A01 Power supply card of Auxiliary converter (Ref : Replacement of capacitors of KUC 153 A01 card after service life of 06 years.)270031330005102463625233
18 OTHER MEASURESPCB card (Ref : Checking and ensuring the tightness of the PCB cards in all the control electronics racks in every schedule)000000000000000
19 OTHER MEASURESLoco earthing (Ref : Checking and attending the earthing brush in every schedule.)000000000000000
20 OTHER MEASURESLoco earthing (Ref : Checking and attending the earthing shunts provided in the locomotive as per SMI/248 in every schedule.)000000000000000
21 SOFT WARE MODIFICATION"Release of new loco software (Ref : CLW to issue the new loco software release having following new features:1610000000000000161
22 SOFT WARE MODIFICATIONComplete redundancy in VCU functionality (Ref : CLW to complete the soft ware modification of complete redundancy in WAG9H.)000080000000008
23 DEVELOPMENT OF NEW ITEMSElectronic Cooling (Ref : Development of Thermo-electric Cooling Modules (TECM) : Extendent field trial to be conducted in 10 locos each at ELS/AQ, GMO, GZB & TKD)00000000000001010
24 DEVELOPMENT OF NEW ITEMSElectronic Cooling (Ref : Development of Air conditioning for MRB. Trial in one loco at ELS/GZB.)000000000000000
25 DEVELOPMENT OF NEW ITEMSAdoption of IGBT speed sensor in GTO converter (Ref : Development of modified AS PERI card of GTO converter suitable for adoption of IGBT speed sensor to be done in 05 locos each at ELS/GZB & TKD for trial. )000000000000055
26 DEVELOPMENT OF NEW ITEMSObsolescence of Electronics and GTO modules. (Ref : Development of functionally equivalent PCB cards and use of IGBT modules in place of GTO. : RDSO to prepare road map. )000000000000000
27 DEVELOPMENT OF NEW ITEMSModification in SR cooling pump. (Ref : Modification in the SR cooling pump to be carried out in 5 locomotives each in ELS/GMO, ELS/LGD, ELS/TKD and ELS/GZB for field trial.)00000000120000012
28 DEVELOPMENT OF NEW ITEMSRoof clamp (Ref : CLW should fit the roof clamps in 5 new locomotives at CLW.)00260000000000026

Home